In the hot Abu Dhabi, our workers overcame all kinds of difficulties together with Lamprell staff and completed the installation of this heavy-duty coiler within 30 days. The quick service, professional technology and perfect cooperation of EZHONG's installation engineers were highly recognized by Lamprell's senior leaders, and we hope to continue to establish a cooperative relationship with EZHONG.